Actual Lift Force of A Meter Out Circuit
- This topic has 0 replies, 1 voice, and was last updated 21 years ago by .
Viewing 1 post (of 1 total)
Viewing 1 post (of 1 total)
- You must be logged in to reply to this topic.
Home | Pneumatics Online › Forums › Actual Lift Force of A Meter Out Circuit
I have used a meter out air circuit with a constant vertical load, ~5000# dead weight (the lifting time is 10 seconds and the stroke is 7 inches). We have a 10-inch bore, 2-inch rod, single acting cylinder. I have set my operating pressure at 14